-
Don Page posted
Our trailer is finally at our school, we are currently installing lights and the brake switch so we can get it tagged. We have the material to dry it in and will start as soon as we get back from Christmas break.
-
-
Don Page posted
We are currently anticipating the completion of our Tiny House trailer around Thanksgiving. The welding class at the Belfry ATC have the materials on site, axles, steel tubing, wheel fenders, etc and will be getting started as soon as their shop is available. We are very excited to get started on our part of this project. We will be posting a…Read More
-
Don Page posted
Phelps Carpentry is here.
-
- Load More Posts